As the dust would be ubiquitous, complete vacuum cleaning of a posted construction would be a daily occurrence. This monstrous task would be a nightmare and totally unfeasible. Alternately, enclosures to capture dust are equally unfeasible.

-
Thomas J. Gryl, National Safety Director for Brand Insulations Inc.
02/11/1972 | Full Details | Law(s): OSHA's Asbestos Standard

Let me state, first, that achievement of a standard of 2 fibers per cc is not, at the present time, technically feasible in all areas of our manufacturing operations. Thus, I cannot estimate fully the total final economic impact on our business, or the total final capital investment required.

-
Edward J. Killian, Vice President for Manufacturing Operations, Gold Bond Building products.
03/14/1972 | Full Details | Law(s): OSHA's Asbestos Standard

Past experience would indicate that in a sizable number of operations it will be impossible to reduce the levels to two fibers, no matter how much money is spent. In these cases, the operations obviously would have to be shut down and the men thrown out of work. We have a very rough idea at this time how large a segment of the manufacturing industry would be affected ion this manner, but an estimate of perhaps 15% to 20% seems reasonable.

-
Matthew M. Swetonic, Executive Secretary of the Asbestos Information Association
03/15/1972 | Full Details | Law(s): OSHA's Asbestos Standard

In our opinion, an incalculable and insupportable cost would be required to reduce emissions to the [two] fiber level....it would take considerably more than two years to attain such levels if in fact, they could be reached at all.

-
GAF Corporation comment, no specific author.
03/14/1972 | Full Details | Law(s): OSHA's Asbestos Standard